AUX ENGINES YANMAR OVERHAULING
DYNAMO REWINDING SINGAPORE
A burned dynamo dismantled on board and landed in pieces at Singapore. Portable D/G placed on board and connected. The vessel sailed to her destination and after a month on her passage from Singapore Repaired Dynamo placed and assembled in good order. Portable generator off landed. With only 2 days Offhire time managed this huge job.
WARTSILLA D/G OVERHAUL AND VIBRATION ABSORVERS RENEWAL
CARGO CRANES
MAIN ENGINE DRIVING CHAIN
D/G CYLINDER COVER OVERHAUL
Cylinder cover firing area condition (photo) and piston / liner